Airport overview
The ReadyLinks Airport
One fiber core for the terminal, the tower, the airfield and the hangar, then the Ethernet, coax and long-haul phone pair each area already has.
0/ 4areas on ReadyLinks
- Switches online 2 / 13
- Clients online 0 / 33
- Existing copper put to work 0 m
- Longest copper run —
Fly to an area
-
Terminal & Gates
Fiber from the MDF to an IDF at each end of the concourse. EX-48s run Cat6 PoE++ to every gate's displays, boarding-pass readers, cameras and Wi-Fi 7 access points, all inside 100 m.
-
Control Tower
Two fiber routes up the shaft to two stacked EX-48s in the cab, each with its own uplink to a different core switch and two hot-swap power supplies.
-
Airfield
The field's old phone pairs reach the glideslope, localizer, weather station and perimeter gates hundreds of metres out, from a GL-24xT-P600D in the lighting vault and a sealed GL-4xTH-RPF in a handhole.
-
Hangar & Jet Bridges
The coax already in the hangar, on every jet bridge and over the baggage belts carries gigabit from GL-24xC-P600D and GL-24xB-P600D hosts to IPC-4C and IPC-4SBNC clients.
Four cables · reach on one run
- Single-mode fiber10G LR optic, MDF to every closet10 km
- ReadyLink over phone pairHandhole to the weather station · 500 m published on one pair465 m
- ReadyLink over coaxHangar RG-6 to the door camera · 900+ m published180 m
- Cat6 Ethernet1000BASE-T channel limit · every gate inside it100 m
Runs measured in this model; bars to scale, 500 m full width (fiber not to scale). In the scene, red posts mark 100 m along each copper run, and the red circle is Cat6's 100 m from the west concourse IDF.
One network from the curb to the end of the runway
An airport is a kilometre or more of field around a terminal, and Ethernet copper is good for 100 m. Trenching new cable across live taxiways, or pulling it through a jet bridge, takes runways and gates out of service. Here, fiber goes from the MDF to a handful of closets, and from each one the Cat6, coax and phone pair already in place carry the rest, with power on the same cable.
The airfield on its old phone pairs
The glideslope, localizer and weather station sit hundreds of metres from the nearest closet. ReadyLink runs over one pair of the field's existing copper, measured at 1.39 Gbps at 100 m and still about 300 Mbps at 400 m. A GL-4xTH-RPF sealed to IP67 waits in a handhole with no outlet, powered from the client end of its pairs.
A tower with no single point of failure
Two EX-48s in the cab are stacked as one, each with two hot-swap power supplies and its own fiber uplink on its own route to a different AX-24 in the core. A cut fiber, a failed switch or a lost power feed leaves the cab online.
Coax already on every bridge
Jet bridges move, and pulling new cable through one takes a gate out of service. GL-24xC-P600D hosts put the coax already on each bridge and in the hangar to work, with IPC-4C clients at the far end giving 2.5GbE and, on a 48 V supply, up to 90 W of PoE++.
Representative install. The airport, building layout, cable routes and equipment placement are examples, and cables and devices are drawn larger than life so they read from the air. ReadyLinks carries the airport's IP network to each shelter, gate and bridge: cameras, access control, monitoring, displays and Wi-Fi. Navigation aids, airfield lighting control and air traffic systems stay on their own certified equipment. ReadyWall firewalls are announced and not yet shipping. Throughput figures are ReadyLinks' measured results; actual reach, throughput and available PoE depend on the cable and the site.